YES was able to use the latest modelling software and American databases to prove that it would be acceptable for the soil to remain in-situ for the proposed amenity end use.
YES was retained as the Environmental Consultant for the on-going monitoring works required at the site as the major restoration and development works continued. YES carried out a P20 groundwater risk assessment to ensure the water environment would not be impacted and is carrying out an on-going water sampling programme.
YES supervised the infilling of an underground fuel tank. The tank could not be removed as it was too close to the footings of a Listed Building. Soil sampling and a contamination assessment was carried out as part of infilling and securing the tank.
YES has carried out on-going monitoring visits and reports, which have formed essential parts of the planning conditions and remediation of the site.